Share This

Wednesday, 1 November 2017

Penang floods and landslides, looking beyound natural causes!

Seeking solutions: Penang Forum member and soil expert Dr Kam Suan Pheng giving her views during the dialogue session themed ‘Penang Floods: A Call for Action’ held at Teow Chew Association in Chulia Street, George Town.
 (Top pic, front from right) Pulau Betong assemblyman Datuk Dr Muhammad Farid Saad, state Opposition Leader Datuk Jahara Hamid and Penanti assemblyman Dr Norlela Ariffin among the participants.
From left) Sim, Cheah, Dr Norlela, Jahara, Shah Headan, Lee and Yap occupying the front row at the dialogue on floods organised by Penang Forum.


Expert: Debris clogging waterways among reasons for flash floods

Some 200 people comprising mostly politicians, experts and residents gather in a dialogue session to discuss the long-standing problem plaguing Penang. Many voice their concerns that over-development in the state could be the cause of the headache.

HEAVY rainfall and high tides are natural causes of floods which cannot be avoided.

However, soil expert and scientist Dr Kam Suan Pheng said there were also other reasons that caused the constant flash floods in Penang.

She said limited capacity to channel off discharge and surface flow which led to water accumulation downstream were some of the causes that resulted in flash floods.

“These issues have been addressed in flood mitigation.

“However, we also have to tackle the causes of increasing impermeable surface areas and debris clogging up waterways, which are also the root causes of flooding problems,” said Dr Kam in her talk on ‘Understanding the Causes of Floods and Seeking Solutions’ yesterday.

Dr Kam, who is also a Penang Forum member, said having proper planning on land usage and development controls, creating more urban spaces and parks besides river bank protection were also vital in flood prevention.

“Stringent monitoring on development projects and protection of hill land and hillslopes are important.

“To do so, policy and legal instruments have to be deployed, while environmentally sensitive and ecologically friendly structural and non-structural solutions should be adopted,” she said.

Dr Kam was one of the speakers at a dialogue session themed ‘Penang Floods: A Call for Action’ held at the Teow Chew Association in Chulia Street.

<< Stringent protection of hill land and hillslopes are vital, says Dr Kam.

Joint Resident Associations of Bandar Baru Ayer Itam chairman K. Suthakar said that for the past two to three years, residents living in Bandar Baru Ayer Itam have been suffering from flash floods.

He said there were some 20 housing schemes in the township comprising 10,000 housing units with a population of 16,000.

“The residents had to face the brunt of it when the whole city was underwater on Sept 15.

“I visited the retention ponds in Lebuh Rambai and Desa Permata Bandar Baru Ayer Itam on Saturday to check whether the ponds have been deepened.

“Sadly, nothing has been done,” he said.

He asked some of the state assemblymen, who were present at the dialogue session, to raise the issue when the state assembly convenes on Thursday.

When hills are at their natural state, they will not collapse, says Aziz Noor. When hills are at their natural state, they will not collapse, says Aziz Noor. >>

Environmental, health and safety consultant Aziz Noor, in his talk on ‘Implications of Hillside Development’, said landslides commonly happened on hillsides or slopes that were cleared.

“When the hills are at their natural state, they will not collapse.

“But when the natural state is violated with the slopes being cut, then landslides are bound to happen.

“Whenever there is a downpour on the cut hill slopes, there would be mudslides contributing to muddy flash floods as well,” he said.

Filepic of recent flooding in Taman Thean Tek, Ayer Itam, Penang.

The dialogue session saw a packed hall of almost 200 people, comprising mostly residents and representatives of residents associations who were affected by the recent flash floods.


Several state assemblymen and politicians from both sides of the divide also turned up at the event organised by Penang Forum and Residents Association of Penang.

Among those present were Penang Barisan Nasional chairman Teng Chang Yeow, state Opposition Leader Datuk Jahara Hamid, Pulau Betong assemblyman Datuk Dr Muhammad Farid Saad, Teluk Bahang assemblyman Datuk Shah Headan Ayoob Hussain Shah, Kebun Bunga assemblyman Cheah Kah Peng, Penanti assemblyman Dr Norlela Ariffin, Machang Bubuk assemblyman Lee Khai Loon, Pulau Tikus assemblyman Yap Soo Huey and Bayan Baru MP Sim Tze Tzin.

Sources: The Star by Logeiswary Thevadas

Engineer: Look out for ‘ticking time bombs’ from hill slopes


GEORGE TOWN: A geotechnical engineer has warned the authorities that steeply-cut hill slopes are “ticking time bombs” that need constant monitoring and maintenance.

Zeezy Global geotechnical and environmental consultant Aziz Noor said in view of the Tanjung Bungah landslide on Oct 21 that took the lives of 11 workers, all authorities, not only in Penang but throughout Malaysia, should keep an eye on all steep slopes as disaster might strike at any time.

He said although a hill slope might appear fine from the outside, it could be on the brink of collapse due to water pressure and vibrations from the surrounding environment.

“Most of these slopes are clay mixed with sand. Clay has an affinity ( to stick together). At particle level, they can hold up.

“When water comes down steep slopes they break the affinity of these particles. And yet they still hold up but it just speeds up the time of the collapse.

“That is why they do not fall right away. They are a time bomb, a disaster waiting to happen,” he said at a talk hosted by Penang Forum today.

Aziz, an American-trained environmental and geotechnical expert, was manager of an independent consultant engineering firm investigating the aftermath of the Highland Towers collapse in Ulu Kelang, Selangor, in 1993, in which 48 people were killed.

He said hills cut beyond their “natural angle” were the ones to watch out for.

“A hill slope that is cut beyond its natural stable angle is not a stable slope. Such slopes are at high risk of failure and can end up in landslides.

“When you have bare slopes like that, the portion of runoff is large; the steeper the slope, the faster the ‘teh tarik’ (mud slide) comes down.

“Basically, when the water runs off faster, the more erosion it causes, and the faster it will go down to lower-lying areas and cause flash floods with silt,” he said.

Aziz said to prevent such disasters from happening, engineers ought to cut hills at a more natural angle and ensure drain holes are built into them.

He said drain holes would release the “water stress” that might be building up beneath the slopes.

Aziz stressed that these measures were not one-off solutions and required constant monitoring from all parties.

“Ordinary folk might think, okay, looks like a nice concrete wall. But you do not know what is going on underneath, and hence, you need to maintain the hillslopes from time to time.

“That is why you see the slopes on our PLUS highway are constantly being maintained. It is something you do not mess around with,” he said.

Aziz said many construction sites cut corners by placing plastic sheets on cut hillslopes, which would not help much in preventing landslides.

“This is akin to putting a band-aid on a very sick person,” he said.

On the Tanjung Bungah landslide, Aziz said the state authorities must beef up their monitoring teams and place them on full patrol at all sites in the state.

“We need all the ‘jabatan’ (departments) to wake up and not sleep behind the wheel. Present-day laws are adequate to enforce and punish those who flout the law.”

Sources: Free Malaysia Today

Penangites upset with DAP reps for skipping dialogue


Front row, from right) Penang Barisan Nasional chairman Teng Chang Yeow, Pulau Betong representative Muhammad Farid Saad and state opposition leader Jahara Hamid at the Penang Forum dialogue on flood woes and hill site developments. – The Malaysian Insight pic, October 29, 2017.

RESIDENTS associations in Penang today were upset that most of their elected representatives skipped a dialogue on flood woes and hill site developments, as local civil society groups continue to push for a moratorium on hill projects.

Penang Forum, a coalition of local civil society groups, had invited the state’s elected reps, but fewer than 10 turned up at the dialogue that drew about 200 people to the Teochew Association in George Town.

The assemblymen seen among the crowd were state opposition leader Jahara Hamid (Teluk Air Tawar), Muhammad Farid Saad (Pulau Betong) and Shah Headan Ayoob Hussain Shah (Teluk Bahang) from Barisan Nasional (BN); and Cheah Kah Peng (Kebun Bunga), Dr Norlela Ariffin (Penanti) and Lee Khai Loon (Machang Bubok) from PKR.

Pulau Tikus rep Yap Soo Huey was the sole DAP assemblyman present while the only MP at the dialogue was PKR’s Sim Tze Tzin of Bayan Baru. The only other DAP member present was Penang Island City councillor Syerleena Abdul Razak.

Also present were Penang BN chairman Teng Chang Yeow, several Gerakan leaders, and Penang Front Party’s Patrick Ooi, who has been critical of the Penang government in the past.

Jahara said the BN reps in the Penang legislative assembly would table a motion to call for all hill land and slope projects to be halted.

“We are not here to point fingers, but fingers have to be pointed at the authorities,” she said.

Norlela, one of the most vocal PKR reps on local developmental issues, said she hoped Pakatan Harapan and BN could set aside their differences to solve flood woes and developmental issues in the state.

Norlela was one of five PKR government backbenchers who abstained from voting to reject a BN motion on land reclamation during the state legislative assembly in November 2015.

DAP holds the most seats in the Penang legislative assembly with 19 out of 40. PKR has 10 while PAS has one seat. BN’s Umno holds the remaining 10.

In a press conference last week after a landslide in Tanjung Bungah killed 11 construction workers, some residents association reps warned the state government that it could lose votes if it continued to allow hill site developments and ignored the people’s objections.

At the dialogue today, the joint residents association rep for Bandar Baru Ayer Itam, K. Suthakar, took a dig at the elected officials when speaking about flood woes in his area. He said Lebuhraya Thean Teik had “turned into a river” when a bad flood hit last month, causing residents to miss work and school.

“Why do they become elected reps? Because they want to serve the people, to solve their problems. But after the election, you don’t see them for three or four years. People are crying for help but you have no time to come,” he said.

Tanjung Bungah Residents Association chairman Meenakshi Raman also said she had expected more than 10 elected reps to attend the dialogue.

“We are disappointed that not many could attend. We had hoped to see more DAP reps,” she said.

It was learned that DAP had an internal party programme at the same time this morning on mainland Penang in preparation for the party’s special congress on Nov 12 to re-elect its central leadership committee.

Meenakshi said the residents association and other civil groups, which recently criticised the state government over hill site developments and flash flood incidents in Penang, were still willing to engage the powers that be in dialogue.

This was despite the association not getting replies to letters it recently sent out to all Penang assemblymen and MPs on its demands to solve flash flood problems.

“We are ordinary people. We have nothing against them, but some (leaders) have accused us of being arrogant. Elected reps must be accountable. There is nothing wrong with the people asking the state government and their YBs (assemblymen) what they are doing,” she told The Malaysian Insight after the dialogue.

Climate change

Meanwhile, Dr Kam Suan Pheng, an expert in geographical information systems, told the dialogue session that floods in Penang were caused by both weather conditions and human activities, adding that the situation would worsen with climate change.

“Since 2003, the emerging trend for rainfall is increasing. Flash floods will be more frequent, happening at lower rainfall thresholds.

“With climate change, we can expect heavier and more intense rainfall,” she said, adding that Penang’s urban drainage was not well planned enough to prevent floods.

Kam said the authorities must tackle the root causes with proper land use planning and development control, stringent protection of hills and river banks, strict monitoring of development projects, and by increasing the number of urban parks.

She said the authorities must also look beyond the environmental, drainage, transportation and social impacts of individual projects, use existing laws and policies and adopt eco-friendly solutions.

Aziz Noor – a consultant with more than 30 years’ experience in areas of environment, health and safety in Malaysia and overseas – said Penang should take the recent Lembah Permai landslide as a wake-up call.

“Legislative controls are more than adequate but compliance is sporadic. Enforcement has been weak,” said Aziz, who is managing director of Penang-based consulting firm Zeezy Global.

Another speaker at the dialogue, lawyer Agatha Foo, said legally, the state should stop development on ecologically-sensitive land over 76m above sea level and on slopes over 25 degrees gradient using existing laws and guidelines.

She also said the authorities could impose strict enforcement, and seek a jail sentence for company directors whose firms violate the law as a more effective deterrent than fines. – October 29, 2017.

Looi Sue-ChernSource: The Malaysian Insight by


Related Link:

Sole DAP rep heckled at Penang woes talks


https://youtu.be/YQM8N0GTuYM

The day the earth moved - Analysis

Penang's 'balding' Bukit Relau under the spotlight

Group: Stop approving hill slope projects - Metro News

Forum gets tepid response from reps - Nation

Project's final approval came from Penang authorities - Nation

Penang DAP: We respect Teh's decision to quit party - Nation 

Tanjung Bungah rep wants to quit DAP - Nation

Related posts:

2 structures collapse due to incompetent engineers and irresponsible officer of MPPP

(From left) Dr Kam will deliver a talk on ‘Understanding the Causes of Floods and Seeking Solutions. State assemblymen expressing inter...
Some representatives of the 24 residents associations and management corporations showing messages urging the state to resolve the flood...
Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.  Approximate Coordinates : 5°20'38.47"N,100°16'...
https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active s..

Speaking out: Penang Forum members protesting outside the CAP office in George Town. Don’t just make it about worker safety issues ..

https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City Council has lodged a police report against the consultant of the aff...

Put on hold: A view of the site for the development of four apartment buildings in Paya Terubong, Air Itam. GEORGE TOWN: Since the ...

Humans Are Destroying the Environment   PETALING JAYA: They are supposed to be guardians of the environment, and yet “certain enforcem...
PETALING JAYA: Some RM40mil from the Skills Development Fund Corp is believed to have been siphoned off by those tasked with utilising i.,

Saturday, 28 October 2017

Malaysia's Budget 2018 Highlights

https://youtu.be/6kKoGiQazqg

https://youtu.be/XkhGpk-L94Y


KUALA LUMPUR: Prime Minister Najib Razak has tabled the RM280 billion Budget for 2018, his last before the next general election which must be called by middle of next year.

Below are Salient points of the budget from Dewan Rakyat.

Civil Servants

• 1.6 million civil servants to receive the following benefits:
– second round time-based promotions
– senior servants who retire due to health reasons will be accorded the same benefits as those who undergo mandatory retirement
– special leave for teachers increased to 10 days a year, up from seven
– seven days unrecorded leave for umrah pilgrimage
– women at least five months pregnant allowed to leave work an hour earlier while husbands accorded the same privilege if their work locations are in close proximity to each other
– maternity leave increased from 300 to 360 days throughout service with a maximum of 90 days a year
– RM1,000 set for minimum pension amount

Senior Citizens, Disabled, Children

• RM1.7 billion for the following areas:
– RM603 million to increase allowance of senior citizens from RM50 to RM350
– RM100 million to increase allowance for the disabled by RM50 a month

Digital Free Trade Zone

• RM83.5 million allocated for DFTZ in Aeropolis, KLIA.
• Increase minimum value for imports from RM500 – RM800.

Sustainable Development

• RM5 billion allocated under Green Technology Funding Scheme.
• RM1.4 billion to reduce non-revenue water programme.
• RM1.3 billion to build Off-River Storage as an alternative water source.
• RM517 million for flood mitigation plans nationwide.

Reduction in Income Tax Rates

• Reduction in individual income tax rates:
– RM20,001 – RM35,000: 5% to 3%
– RM35,001 – RM50,000: 10% to 8%
– RM50,001 – RM70,000: 16% to 14%
• Increase disposable income between RM300-RM1,000 while 261,000 do not have to pay tax

Foreign Domestic Helpers

• Allow employers to hire foreign domestic helpers directly without agent.

GST

• No change to Goods and Services Tax but government to propose either exemption or zerorising certain items and services.
– local councils
– reading materials
– cruise operators
– construction of schools and places of worship funded by approved donations
– oil and gas equipment imports under lease agreement
– import of big ticket items like planes and ships
– management and maintenance of homes with strata titles

Health

• RM27 billion for better quality health services.
• RM4.1 billion for medical supplies and consumables.
• RM1.4 billion to upgrade and maintain health facilities, equipment, ambulances and construction of operation theatres in three hospitals.
• RM100 million to upgrade hospitals and clinics.
• RM50 million to subsidise hemodialysis treatment; and RM40 million for medical assistance fund.
• RM10 million for treatment of rare diseases; RM30 million for health community programmes.
• RM50 million for voluntary health insurance scheme.

Housing

• RM2.2 billion allocated to boost home ownership.

BR1M

• 7 million benefited from RM6.8 billion in BR1M payouts and in 2018 the 7 million will continue to receive the same payout.

Orang Asli Benefits

• RM50 million for Orang Asli for economic development and quality of life enhancement.
• RM60 million for Orang Asli village development.

Indian and Chinese Benefits

• RM50 million for Chinese SME loans through KOJADI.
• RM30 million to be channelled to the 1Malaysia Hawkers and Petty Traders Foundation.
• RM65 million allocated for Chinese New Villages and RM10 million for house restoration.
• RM1.5 billion additional Amanah Saham units for Indians.
• Increase the intake of Indians to IPTA and public service (7%)

Bumiputera Benefits

• RM2.4 billion allocated to UiTM.
• RM3.5 billion for the following initiatives:
– RM2.5 billion for MARA higher education and training scholarships
– RM90 million for Program Peneraju Profesional, Skil dan Tunas
– RM200 million for MARA Graduate Employability Training Scheme or GETS
– RM555 million for Bumiputera Entrepreneurship Enhancement Programme (RM200 million for PUNB Entrepreneurship Programme and Business Premises; RM200 million for MARA Entrepreneurship; RM115 million for Vendor Capacity Programmes).
• RM150 million for Pelaburan Hartanah Berhad and RM150 million to EKUINAS.

Defence

• A total of RM14 billion for armed forces; RM9 billion for police force, RM900 million for Malaysian maritime.
• RM3 billion for purchase and maintenance of defence assets; RM720 million for the construction of 11 police headquarters and six police stations.
• RM490 million to MMEA for repair and maintenance of ships, boats, jetties and procurement of three patrol vessels.
• RM250 million to ESSCOM
• RM50 million to enhance weapon capability to combat terrorism.
• Government to build 40,000 houses in phases for families of armed forces personnel.
• RM40 million to upgrade five hospitals; build four polyclinics and one hospital for veteran armed forces personnel.

Rural Development

• RM200 million allocated for Felda for water supply and road upgrades.
• 112,ooo settlers will each receive windfall worth RM5,000.
• RM43 million allocation for Felda settlers and RM60 million for replanting of oil palm, RM164 million allocation to build 5,000 houses for second generation Felda settlers.
• RM1.1 billion for people-centric projects; RM1 billion to develop communication infrastructure; RM934 million for rural projects; RM672 million for electricity supply; RM420 million for clean water supply inclusive of RM300 million in Sabah and Sarawak covering 3,000 homes; RM500 million for public infrastructure maintenance; RM50 million for mapping and measuring of native customary land
– RM30 million for Sarawak, RM20 million for Sabah.
• RM6.5 billion for rural infrastructure which includes RM2 billion for the Pan Borneo Highway.

Education

• RM4.9 million allocated for 100 scholarships for TVET students.
• RM4.9 billion allocated for Technical and Vocational, Education and Training (TVET).
• RM200 million added to PTPTN fund for B40 families.
• Discount for repayment of PTPTN loans is extended to Dec 31, 2018 (20% for full repayment, 10% for 50% repayment, and 10% for direct debit salary deduction).
• RM100 for 3.2 million schoolchildren totalling RM328 million.
• RM2.9 billion for food aid, text books and minor federal scholarships.
• RM2.5 billion for maintenance of schools – RM500 million in Peninsula, RM1 billion in Sabah, RM1 billion in Sarawak, in addition to an existing special fund for maintenance.
• RM654 million for construction of four pre-schools; nine Permata schools; two centres for children with autism; 48 primary, secondary as well as vocational and matriculation centres.
• RM61.6 billion for development of education.

TN50

• RM20 million for Bukit Jalil sports school.
• RM112 million to construct 14 new sports complexes nationwide.
• RM1 billion to conduct sports initiatives to make country a sports powerhouse.
• RM50 million to fund social enterprise and NGOs to solve communities issues.
• RM40 million for open interview programme under the 1Malaysia training scheme (SL1M).
• All undergraduates and those in Form Six will continue to receive book vouchers.
• RM90 million for MyBrain programme for 10,600 students to further their studies at post-graduate level.
• RM400 million for research and development grants to public institutions of higher learning with a special allocation to Universiti Malaya to achieve status of Top 100 universities in the world.
• RM2.2 billion for JPA scholarships, the ministry of higher education and ministry of health.
• RM20 million for setting up of a Cultural Economy Development agency.
• RM190 million to upgrade 2,000 classes to become smart learning classrooms.
• To enhance present computer science module to include coding programme in primary and secondary school curriculums.
• RM250 million to build science, technology, engineering and mathematics centre.
• Special fund set up for children born between Jan 2018 to Jan 2022.
• Tax relief for employers who employ the disabled that include those involved in accidents and have critical illnesses.
• Local councils to make it mandatory for all new buildings to have childcare facilities, beginning in Kuala Lumpur.

Public Transport

• Government studying proposal for a new airport in Pulau Tioman.
• Government to build new airport for Mukah and expand airport for Kota Bahru and Sandakan.
• Government to upgrade Penang and Langkawi international airports.
• RM55 million transport subsidy for rural rail services from Tumpat to Gua Musang.
• RM45 million to create a biometric control system to monitor the movement of express bus services.
• RM95 million for the repair and construction of jetties as well as river mouth dredging.
• RM1 billion for public transport fund for start-up capital and procurement of assets like buses and taxis.
• RM3 billion for transport development fund for the purchase of maritime assets, aerospace technology development and rail.

Infrastructure

• Special border economic zone in Bukit Kayu Hitam to be developed.
• Pulau Pangkor to be declared a duty-free zone.
• RM230 million to continue central spine road project from Raub to Bentong.
• RM5 billion for the west coast coastal highway from Banting to Taiping.
• Government to expedite MRT3 project by two years from 2027 to 2025.
• RM32 billion for MRT2 project (Sg Buloh-Serdang-Putrajaya).
• RM110 million to provide alternative road to Port Klang.

Tourism

• RM30 million to be allocated to the Malaysian Healthcare Travel Council to boost medical tourism.
• RM500 million for the promotion and development of tourism.
• RM1 billion to tourism infrastructure development fund.
• RM2 billion fund for SMEs in tourism.

Agriculture

• RM200 monthly for a duration of 3 months for padi farmers while waiting to harvest their crops, which amounts to RM150 million.
• RM200 million for rubber replanting, RM140 million for development, re-planting and promotion of oil palm.
• Almost RM500 million to improve agriculture infrastructure.
• RM2.3 billion in incentives and assistance for the agriculture community.
• RM6.5 billion allocated to the smallholders, farming and fishing communities.

Other Highlights

• RM100 million with a 70% government-guaranteed loan for the furniture export industry.
• RM200 million allocated for training programmes, grants and SME easy loans under SME Corp; and close to RM82 million for halal products and industry development.

• RM2 billion set aside for 70% government-guaranteed loans.
• RM5 billion allocated for start-up capital for businesses.
• RM7 billion allocated to Skim Jaminan Pembiayaan Perniagaan.
• SMEs expected to contribute 41% of GDP by 2020.
• Private sector investment is expected to reach RM260 billion by 2018 and will be the engine of growth.
• Total investments in the country is expected to increase by 6.7% contributing to 25.5% to the GDP for 2018.
• RM26.34 billion for economic sector; RM11.72 billion for the social sector; RM5.22 billion for the security sector; RM2.72 billion for general administration sector.
• Administration budget is RM119.82 billion; other expenditure is RM1.08 billion; asset procurement is RM577 million.
• For 2018, federal government is expected to collect RM239.86 billion in revenue.
• Allocation for Budget 2018 is RM280.25 billion, an increase of over RM20 billion.
• B40 household income has increased to RM3,000 per month from RM2,629 for the period 2014-2016.
• Monthly median income has increased from RM4,585 in 2014 to RM5,288 in 2016.
• Current per capita income stands at RM40,713, expected to reach RM42,777 by 2018.
• Our international reserves now stand at US$101.4 billion.
• In August, exports hit a high of RM80 billion, recording double-digit growth.
• 69% or 2.26 million new jobs created so far from the target 3.3 million to be created by 2020.
• 3 international credit rating agencies have reaffirmed our A-rating with stable prospects.
• Looking at 2009, our fiscal deficit was at 6.7% of the GDP and is expected to decrease to 3% in 2017 and 2.8% in 2018.
• Actual private investment for 2016 is over RM211 billion.
• Government projection growth of between 5.2% to 5.7% for 2017, higher than the projection in March of between 4.3% and 4.8%.
• Projected GDP increase from 4.9% to 5.2% for 2017.
• The country has had a growth rate of 5.7% in the first half of 2017.

Source: Free Malaysia Today

Related posts:

Malaysia's Budget 2017 Highlights

Bloated civil sevice in Malaysia must cut down the size and salaries

Huge Civil Service Size, Attractive Emoluments and Benefits are costing Malaysia !

Call on the Government to downsize the country’s bloated civil service

Supersized and overweight civil servants

Political parties banking on votes from the civil servants, the sacrosanct!

Malaysia world's No.1 highest civil servants-to-population ratio! Its tenure of service legally vulnerable but notoriously difficult to dismiss!



Related Links:

Friday, 27 October 2017

Penang floods, support pours in for dialogue

(From left) Dr Kam will deliver a talk on ‘Understanding the Causes of Floods and Seeking Solutions. State assemblymen expressing interest in attending are Dr Norlela, Cheah, Muhamad Farid, Ooi and Shah Headan.

School students and the public wading through floodwaters in Jalan Trengganu
The evacuation of stranded residents using a boat in Taman Thean Tek during the Sept 15 floods.
Filepix of cars getting stalled on flooded Jalan Ayer Itam
MORE than 10 elected representatives from Pakatan Rakyat and Barisan Nasional have so far confirmed their attendance at the dialogue session ‘Penang Floods: A Call for Action’ to discuss floods at the Teow Chew Association in Chulia Street on Sunday from 10am till noon.

Kebun Bunga assemblyman Cheah Kah Peng from PKR said the briefing was a good initiative to gather feedback from the people.

“As people’s representatives, we should always have a positive mind dtowards discussions, whether it is positive or negative.

“Dialectics process is necessary to get to the bottom of a problem,” he said yesterday.

Penanti assemblyman Dr Norlela Ariffin, also from PKR, believes the dialogue session would be a great resource for her to learn more about what was happening on the island.

“I have always been concerned about the flooding woes in my constituency and other parts on the mainland.

“I want to know more about flooding on the island too,” she said.

Dr Norlela said the input from the session would be useful for help to raise questions in the state assembly sitting from Nov 2.

Teluk Bahang assemblyman Datuk Shah Headan Ayoob Hussain Shah from Barisan Nasional said the session would be a good platform for the people and affected flood victims to raise their concerns.

“Our priority is to help the rakyat (people) and we will come in support of them,” he said.

Tanjung Bungah assemblyman Teh Yee Cheu, from the DAP, said he would send two of his representatives to the session.

“I will raise flood issues during the assembly sitting. I have done this many times before,” he said.

Pulau Betong assemblyman Muhammad Farid Saad said he would be attending a function in his constituency. However, he said he would try to attend the dialogue “even though I may be late.”

Jelutong MP Jeff Ooi said he would be attending an event to foster unity between Muslims and non-Muslims at Jamek Mosque in his constituency at the same time.

“I will be late if the event at the mosque starts late,” he said.

The dialogue will be moderated by Penang Forum steering committee member Ahmad Chik.

Forum member Dr Kam Suan Pheng, a soil expert and scientist, will deliver a talk on ‘Understand-ing the Causes of Floods and Seeking Solutions’.

Lawyer Datuk Agatha Foo will talk on ‘Laws and Guidelines Relating to Hill Land and Hill Slope Development’.

Consumers Association of Penang legal adviser Meenakshi Raman will touch on the ‘Demands of Residents’ Associations of Penang’ and it will be followed by the dialogue session.

Meenakshi, who is Tanjung Bungah Residents Association chairman, urged resident associations and management corporations to attend the event.

She said 24 resident associations, management corporations and residents groups had joined the Residents’ Associations of Penang which was formed last year.

“We hope more will sign up. More members means more strength in handling issues affecting the community,” she said.



For details on the dialogue, email penangforumm@gmail.com or call 04-8299511 (Jaspal).

Source: The Star by Logeiswary Thevadass

Related Links:

NGO legal advisor considers Ops Lalang incarceration 'a second ...


Related posts:

Some representatives of the 24 residents associations and management corporations showing messages urging the state to resolve the flood...
Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.  Approximate Coordinates : 5°20'38.47"N,100°16'...
https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active s..

Speaking out: Penang Forum members protesting outside the CAP office in George Town. Don’t just make it about worker safety issues ..

https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City Council has lodged a police report against the consultant of the aff...

Put on hold: A view of the site for the development of four apartment buildings in Paya Terubong, Air Itam. GEORGE TOWN: Since the ...

Humans Are Destroying the Environment   PETALING JAYA: They are supposed to be guardians of the environment, and yet “certain enforcem...
PETALING JAYA: Some RM40mil from the Skills Development Fund Corp is believed to have been siphoned off by those tasked with utilising i..

Thursday, 26 October 2017

Penang Paya Terubong Residents living under shadow of fear!

Put on hold: A view of the site for the development of four apartment buildings in Paya Terubong, Air Itam.

GEORGE TOWN: Since the deadly landslide in Tanjung Bungah, people in Paya Terubong are looking over their shoulder – and up at a nearby hill.

They have been trying for years to stop a project comprising four towers, each over 40 storeys tall, approved on a hillside across the road from their homes.

Because the project has already been approved, the residents are down to one last resort – the state Planning Appeals Board.

“We must try. The only thing between our homes and those four towers will be a new two-way street that the developer will build if this project goes on,” said Taman Sri Rambai and Taman Lau Geok Swee Residents’ Association chairman Dr Ti Lian Geh.

The plan, he said, was supposed to be six-storey townhouses but the developer put in a request to change it to high-density apartments.

He said the residents have been living in fear after learning that the development plan was changed to three blocks of 47-storey luxury apartments and a 41-storey block of affordable housing.

He said a hearing is ongoing with the Planning Appeals Board to stop the development.

“Building skyscrapers on a steep hillslope is dangerous. If the towers come down, the whole neighbourhood will be gone,” he said, adding that the high-density project will also worsen traffic congestion there.

He told a press conference yesterday that the earthworks two years ago caused frequent flash floods, mudslides and torrential mudflows in the neighbourhood.

Penang MCA and Gerakan, which organised the press conference, urged the state government to revoke the approval.

Bukit Gelugor MCA division deputy secretary Choong Jun Jie said that every time there is a downpour, the residents worry.

“We do not want another tragedy,” he said.

Penang Gerakan vice-chairman Oh Tong Keong said people’s lives are in jeopardy when highrise projects are given priority.

The staggered hillslope is now covered with geotextile sheets after the Penang Island City Council issued a stop-work order about two years ago.

Penang Island City Council Engineering Department director Addnan Mohd Razali said all construction work there except for mitigation measures have been stopped pending the outcome of the residents’ appeal.

Source: The Star by Logeiswary Thevadass and Rena Lim

Related Links:


Compensation sought for landslide victims’ families

Sadness turns to anger as the blame game hots up


Related posts:


https://youtu.be/4qaOB1n5tgA GEORGE TOWN: The Penang Island City Council has lodged a police report against the consultant of the aff...



Speaking out: Penang Forum members protesting outside the CAP office in George Town. Don’t just make it about worker safety issues ...



Behind BJ Cove houses at Lintang Bukit Jambul 1 is an IJM Trehaus Project.  Approximate Coordinates : 5°20'38.47"N,100°16'..


https://youtu.be/QB45Q2_mOG0 Suspicious activity: A photo taken from Penang social activist Anil Netto's blog showing an active s.



Some representatives of the 24 residents associations and management corporations showing messages urging the state to resolve the flood...



Humans Are Destroying the Environment   PETALING JAYA: They are supposed to be guardians of the environment, and yet “certain enforcem..

Errant hill clearing by developers causes of floods, sinkholes, seepages damaged houses!

 

Save Penang Hill from the greedy

 

Penang Forum concerns over hill clearing and floods; the Declaration & Recommendation

 

Getting titles right in the engineering field in Malaysia

   Getting titles right in the engineering field in Malaysia ..

RECENTLY, the Institution of Engineers Malaysia (IEM) received an enquiry on the usage of the title “Engr.” for members of the institution. The title “Ir” was first introduced by IEM in the early 1970s for both the graduate and corporate members of the Inst...Getting titles right in the engineering field in Malaysia rightwaystosuccess.blogspot.com