Share This

Showing posts with label Bayan Baru PKR MP Sim Tze Tzin. Show all posts
Showing posts with label Bayan Baru PKR MP Sim Tze Tzin. Show all posts

Wednesday, 15 July 2015

Council slow to act on Botak Hill which is to be patched up soon

An eyesore: Mitigation works being carried out to restore the cleared slopes of Bukit Relau.
An eyesore: Mitigation works being carried out to restore the cleared slopes of Bukit Relau.

Council slow to act on Botak Hill

GEORGE TOWN: The Penang Island City Council has come under fire for taking such a long time to tackle the illegal hill clearing at Bukit Relau.

Bayan Baru PKR MP Sim Tze Tzin (pcs left) said it should not have taken so long to carry out mitigation work at the 22.89ha site which became known as Botak Hill after it was cleared.

“When the issue broke out in 2013, I called a senior council officer who told me that it would be settled within six months.

“But after two years, the problem is still not settled.

“This is not rocket science. What is so difficult?” he told a press conference yesterday in Sungai Dua near here.

Sim said someone should be held responsible for the delay and urged the state to find the culprit.

“The person has to be punished as this has to do with accountability.

“If you cannot do the job, then resign to let other people do it,” he said.

Sim was commenting on the latest news report which stated that the mitigation work being carried out by General Accomplishment Sdn Bhd was scheduled to be completed by October. - The Star 15/7/15

Botak Hill to be patched up soon

GEORGE TOWN: Mitigation works on Bukit Relau, infamously known as Botak Hill after a section of its top slope was cleared in 2013, is scheduled to be completed by October.

The Penang Island City Council (MBPP) said the mitigation works started in April and was expected to be completed in six months.

The council said it had endorsed the Erosion and Sedimentation Control Plan (ESCP) and slope strengthening design to mitigate landslips and pollution caused by mud flow based on the proposal by the geotechnical consultant appointed by General Accomplish-ment Sdn Bhd which owns the cleared site.

MBPP said the mitigation plan was vetted by the state’s Hillside Geotechnical Advisory Panel chairman Dr Gue See Sew.

General Accomplishment was fined RM30,000 by a Sessions Court here in July 2013 after a represen-tative pleaded guilty on behalf of the company to clearing the 22.89ha site between April 24 and May 8 the same year without obtaining written approval from then Penang Municipal Council (MPPP).

The offence under Section 70 A of the Street, Drainage and Buildings Act 1974 carries a maximum five-year imprisonment or maximum RM50,000 fine, or both.

MBPP said in a statement yesterday that the mitigation measures include the building of a few catchment and sedimentation ponds along the access route to the site, cutting the slope to reduce its steepness and covering the exposed slope with vegetation.

The council said the works also involved the building of cascading drains along the access route to dissipate the energy of surface runoff and mitigate soil erosion.

Several residents living nearby had earlier this month raised their concern after seeing earthworks being done at the site.

MBPP said the land cutting was done to allow access for heavy vehicles and to carry out rock blasting.

It said huge boulders needed to be removed to ensure a safe route and for the mitigation works to proceed, adding that the rock blasting was approved by the Minerals and Geoscience Depart-ment and police.

MBPP said it would continue to monitor the works to ensure that it was carried out in accordance with the approved mitigation plan.

It said grass had been planted on the access route to prevent erosion and that more plants could now be seen on the cleared slope. The Star 14/7/15

Related posts:

Deterrent action for housing developers mooted

Building structural integrity & failure: problems, inspections, damages, defects, testing, 

Reponsible housing developers' traits and qualiies expected

Who is responsible: developer, contractor, local council or house-owner for the damages? 
  Who is responsible for slope management? Does the responsibility come with the property bought by the purchaser? THE collapse of a...

House buyers, learn your rights
House buyers, learn your rights. I RECENTLY moved into our new house in Sungai Ramal Dalam. I bought the property back in 2012 and we received t



I REFER to the article “Local govt polls may cause racial polarisation” ( Sunday Star, Jan 25) and would like to share my views on matters. ...